Calendar
Project calendar and maintenance window planning
This page acts as the stable public calendar path for restoration projects, migration cutovers, launch freezes, and post-launch review checkpoints.

Before Launch
Confirm the pages that must stay live, gather working credentials, and decide which legacy URLs need exact preservation.
During Cutover
Switch the homepage, verify navigation, confirm remaps, and test contact and blog index pages before announcing the change.
After Launch
Review analytics, crawl priority URLs, and log any backlinks that need a more exact remap or dedicated replacement page.
Recommended Sequence
Keep the schedule tied to visitor risk, not only to internal milestones.
- Freeze title and slug changes for priority backlink pages first.
- Update footer links and contact information before the public switch.
- Test the homepage, calendar, gourmet, salon, and contact paths from a clean browser session.
- Reserve a short post-launch window for redirect fixes and copy cleanup.

Useful checks for every launch window
Header Check
Confirm the active theme, menu locations, and brand/tagline display are correct on desktop and mobile.
Footer Check
Verify that the contact email and legal links are visible and that no stale builder credits remain.
Path Check
Hit every priority legacy URL with a direct request and make sure the visitor lands on a useful destination.
Need a maintenance calendar for your own rebuild?
Contact us at [email protected] and we can scope the freeze window, launch sequence, and post-launch review steps.